Concrete Calculator: Slabs, Footings, Columns and Steps

One calculator for every pour — a single slab, footing, column or set of steps, or a whole project list added up.

Enter your numbers

ft
ft
in
in
in
in
ft
ft
in
in

slab L(ft) x W(ft) x T(in) · footing L(ft) x W(in) x D(in) · column dia(in) x depth(ft) x count · steps count x width(ft) x rise(in) x tread(in)

%
$

Leave 0 to skip cost.

$

Ask local suppliers; leave 0 to skip.

Results

How this calculator works

Concrete is ordered by volume. Each shape is turned into cubic feet — slab: length × width × thickness; footing: length × width × depth; round column: π × radius² × depth; steps: each step is a block one riser taller than the one in front, so the volumes add up as 1 + 2 + 3 … risers. The total is increased by your waste allowance, divided by 27 to get cubic yards, and divided by the bag yields — 0.6 cu ft for an 80 lb bag, 0.45 for 60 lb and 0.3 for 40 lb.

Use the project list to add several pours — a patio, its footing and a few post holes — into one order.

Slab: L × W × (T ÷ 12) Footing: L × (W ÷ 12) × (D ÷ 12) Column: π × (D ÷ 24)² × H × count Steps: W × (R ÷ 12) × (T ÷ 12) × n(n + 1) ÷ 2 Cubic yards = cu ft × (1 + waste) ÷ 27 Bags = cu ft ÷ 0.6 (80 lb) · 0.45 (60 lb) · 0.3 (40 lb)

Assumptions and tips

  • Bag yields from the Quikrete Concrete Mix data sheet.
  • Steps are solid concrete, the top step deep as one tread; for a landing, add a slab line.
  • Ground that is not flat or forms that bow need more concrete — 10% waste covers ordinary jobs.

Worked example

Using the default values in the calculator above:

InputValue
What are you pouring?Slab, patio or pad
Length12 ft
Width10 ft
Thickness4 in
Waste allowance10 %
Price per 80 lb bag (optional)$0
Ready-mix price per cubic yard (optional)$0

ResultValue
Concrete needed1.63 cubic yards
80 lb bags74 bags
60 lb bags98 bags
40 lb bags147 bags
Volume before waste40 cu ft
Total weight (≈145 lb/cu ft)6,380 lb

Step by step:

  1. Volume = 12 × 10 × (4 ÷ 12) = 40 cu ft
  2. With 10% waste: 44 cu ft = 1.63 yd³
  3. 80 lb bags = 44 ÷ 0.6 = 73.33 → 74 bags

Concrete for common slabs (4 in thick, 10% waste)

Calculated with this tool.

SlabConcrete needed80 lb bags
4 × 4 ft0.22 cubic yards10 bags
8 × 8 ft0.87 cubic yards40 bags
10 × 10 ft1.36 cubic yards62 bags
12 × 10 ft1.63 cubic yards74 bags
12 × 12 ft1.96 cubic yards88 bags
10 × 20 ft2.72 cubic yards123 bags
16 × 16 ft3.48 cubic yards157 bags
20 × 20 ft5.43 cubic yards245 bags
24 × 24 ft7.82 cubic yards352 bags

Common mistakes to avoid

  • Entering slab thickness in feet instead of inches.
  • Ordering ready-mix with no extra — running short mid-pour leaves a cold joint.
  • Forgetting the footing or thickened edges under a slab.

Frequently asked questions

How much concrete do I need for a 12 × 10 slab, 4 in thick?

40 cu ft, 1.48 yd³ before waste; with 10% extra, 1.63 yd³ or 74 bags of 80 lb.

How many 80 lb bags make a yard of concrete?

45 bags (27 ÷ 0.6).

When should I order ready-mix instead of bags?

Above about one cubic yard most people order a truck; it is faster and more consistent than mixing 45+ bags by hand.

How do I calculate concrete for post holes?

Choose “Round column / post holes”, enter the hole diameter and depth, and the number of holes.

Sources

Anirban KunduBuilt and reviewed by Anirban Kundu, Creator & Editor · M.Sc Physics, 20 years teaching science