How to Pour a Concrete Patio: A Step-by-Step Guide for First-Timers
Plan, form, pour, finish and cure a concrete patio. Real material numbers for a 12×12 slab, joint spacing, curing time and the mistakes that cause cracks.
Bags feel cheaper because you buy them a few at a time. Per cubic yard, they are usually the expensive option. Here is how to compare honestly.
Manufacturers publish a yield for each bag size. For Quikrete’s standard Concrete Mix:
| Bag | Yield | Bags per cubic yard |
|---|---|---|
| 40 lb | 0.30 cu ft | 90 |
| 50 lb | 0.375 cu ft | 72 |
| 60 lb | 0.45 cu ft | 60 |
| 80 lb | 0.60 cu ft | 45 |
A cubic yard is 27 cubic feet, so the last column is simply 27 ÷ yield. Whatever the bag size, a yard of concrete weighs about the same — close to two tons once mixed.
Prices vary a lot by region, so treat any figure as a starting point and get local quotes. As one reference point, HomeServe’s cost guide uses about $6 per 80 lb bag, which works out to roughly $270 per yard, and an average ready-mix price of about $108 per yard, with many homeowners paying $119–$147 including delivery within 20 miles.
The catch with a truck is the short-load fee. A standard truck carries around 10 yards, and suppliers charge more per yard for smaller orders — the same guide gives about $53 extra per yard for loads under 10 yards. Even with that surcharge, delivered concrete often lands below the per-yard cost of bags.
At 4 in thick with 10% waste, our slab calculator gives 1.96 cubic yards, or 88 bags of 80 lb mix.
| Option | Rough material cost | Labor reality |
|---|---|---|
| 88 × 80 lb bags at $6 | ≈ $528 | Lift and mix about 7,000 lb; several helpers and a mixer |
| 2 yd ready-mix at $119–$147 + $53/yd short load | ≈ $344–$400 | Concrete arrives at once; you place and finish |
Delivery minimums, distance charges and Saturday surcharges can change this, which is why our calculator lets you enter your own bag price and per-yard price to compare.
Price is only half the story. Concrete starts to stiffen within a couple of hours, and a slab should be placed in one continuous pour. Mixing 45 bags per yard by hand or with a small drum mixer is slow, and if the first batches start setting before the last ones arrive you get cold joints — weak seams where fresh concrete meets old.
A truck also delivers a consistent mix. Hand-mixed batches tend to vary in water content, and the wettest ones end up weaker and dustier.
Under about half a yard, bags are usually simpler. Between half a yard and one yard, get a quote — the answer depends on your supplier’s minimums and your helpers. Above a yard, a truck (or a mix-on-site “short load” service) is usually cheaper, faster and makes a better slab.
Whichever you choose, order a little extra. Running short in the middle of a pour is far worse than having a few bags left over.
Ready-mix suppliers are used to contractors who speak the jargon. Have these answers ready when you call:
Some suppliers run volumetric (mix-on-site) trucks that carry dry materials and mix only what you use, which can suit small or uncertain volumes. Rental yards in some areas offer trailer mixers you tow home with a yard or less of concrete. Both reduce the short-load penalty, so they are worth asking about for jobs between half a yard and two yards.
When comparing, include everything: mixer rental and fuel, wheelbarrows, your helpers’ time, the trip to haul bags (a pickup truck carries far less than 88 bags safely), and any bags left over. For a truck, include delivery distance charges, waiting-time fees and a pump if the truck cannot get close. Put your numbers into the calculator’s bag-price and per-yard fields to see the comparison for your own job.
About 45. Each 80 lb bag yields about 0.60 cubic feet, and a cubic yard is 27 cubic feet.
A surcharge many suppliers add when you order less than a full truck. It covers the cost of sending a truck for a small amount. It varies widely, so ask for it when you get a quote.
Fast-setting mixes are designed mainly for setting posts, where you pour dry mix into the hole and add water. For slabs, use a standard concrete mix or ready-mix and follow the finishing steps.
Round up and keep the waste allowance. Forms bow, subgrade is uneven and some concrete stays in the truck or wheelbarrow. Running short mid-pour is costly.
Not inherently — both can be strong. The difference is consistency: hand-mixed batches vary in water content, and long pours risk cold joints between batches.
Plan, form, pour, finish and cure a concrete patio. Real material numbers for a 12×12 slab, joint spacing, curing time and the mistakes that cause cracks.
Typical concrete slab thickness for patios, walkways, shed bases, driveways and garages — and how going from 4 to 5 inches changes strength and cost.
The key International Residential Code stair rules in plain English — 7¾ in risers, 10 in treads, 6 ft 8 in headroom, 3/8 in tolerance — with a worked layout.